Hillsborough Boulevard Water Main Project

Project Description

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. 到美国41号. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch 阶段 2B Pipeline.

The Peace River Manasota Water Authority’s Regional Integrated Loop 阶段 2B Pipeline is a 42-inch steel potable water transmission main that will start at the Authority's existing 42-inch Regional Interconnect and end at the Gulf Coast Booster Station. 

This segment of the regional integrated loop system will boost regional resiliency, bidirectional water transfer capability and lays the groundwork for the southern regional loop with future pipeline projects.

Project Location

Hillsborough Boulevard from Yorkshire St. 到美国41号

Project Impacts

阿特沃特圣. south of the Hillsborough Blvd. intersection will be closed starting at 7 a.m. Tuesday, May 28, through Friday, June 7. Detour signs will be in place to aid in travel through this area. Travelers are encouraged to choose an alternate route when possible.

Latest Updates

建设 has begun. 

Crews have installed the 42-inch and 8-inch pipe from Serris Drive to Baldur Drive. They are now restoring this section.

预算

阶段 成本
建设 $5,045110.89
总预算 $5,045110.89
Funding source(s): Capital Improvement Funds 

时间表

阶段 Estimated Start Date Forecast Completion Actual Completion
建设 03/04/2024

Supporting Materials

Hillsborough Boulevard Water Main Project Project Image

Project 阶段
建设

最后一次更新
03/04/2024

Project Manager
Mike Martindell

Public Relations
Caroline Wannall
Email Public Relations

Sponsor Department
公用事业公司

Design Engineer/Architect
Kimley角

建设 Contractor
伍德乐夫 & 儿子