Project Description
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. 到美国41号. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch 阶段 2B Pipeline.
The Peace River Manasota Water Authority’s Regional Integrated Loop 阶段 2B Pipeline is a 42-inch steel potable water transmission main that will start at the Authority's existing 42-inch Regional Interconnect and end at the Gulf Coast Booster Station.
This segment of the regional integrated loop system will boost regional resiliency, bidirectional water transfer capability and lays the groundwork for the southern regional loop with future pipeline projects.
Project Location
Hillsborough Boulevard from Yorkshire St. 到美国41号Project Impacts
阿特沃特圣. south of the Hillsborough Blvd. intersection will be closed starting at 7 a.m. Tuesday, May 28, through Friday, June 7. Detour signs will be in place to aid in travel through this area. Travelers are encouraged to choose an alternate route when possible.Latest Updates
建设 has begun.
Crews have installed the 42-inch and 8-inch pipe from Serris Drive to Baldur Drive. They are now restoring this section.
预算
阶段 | 成本 |
---|---|
建设 | $5,045110.89 |
总预算 | $5,045110.89 |
时间表
阶段 | Estimated Start Date | Forecast Completion | Actual Completion |
---|---|---|---|
建设 | 03/04/2024 |
Supporting Materials
Project 阶段
建设
最后一次更新
03/04/2024
Project Manager
Mike Martindell
Public Relations
Caroline Wannall
Email Public Relations
Sponsor Department
公用事业公司
Design Engineer/Architect
Kimley角
建设 Contractor
伍德乐夫 & 儿子